The Kitchen

 

(The photo on the left above is a listing photo from the seller’s agent.)

 

to-do

  • Paint walls
  • Paint trim & doors
  • Remove upper cabinet doors
  • Patch and paint upper cabinets
  • Add and paint extra shelves
  • Add extra storage via hooks and pegboard
  • Have sink repaired and add disposal
  • Add decorative cabinet backing
  • Replace outlet covers
  • Repair or replace flooring (stick-on tiles)
  • Add decorations and art

Master Bedroom

 
 

to-do

  • Paint walls
  • Paint trim
  • Paint closet
  • Add closet shelving
  • Find and buy dresser
  • Buy/make headboard + decorative bedframe
  • Buy/make nightstands
  • Add decorations and art

The Bathrooms

 
 

to-do

  • Paint walls
  • Paint trim
  • Add ventilation
  • Extend plumbing to add shower to bathtub (?)
  • Replace sink base for more storage (?)
  • Resurface tiles (?)
  • Replace medicine cabinet
  • Add outlet
  • Add decorations and art
 
03.31_9.jpg
 

to-do

  • Paint walls
  • Paint trim
  • Add ventilation
  • Replace medicine cabinet
  • Remove shower and shelves (?!)
  • Add small linen closet (?)
  • Add outlet
  • Add decorations and art

The studio

 
 

to-do

  • Paint walls
  • Paint trim and built ins
  • Paint floor
  • Replace light fixture
  • Replace outlet covers
  • Make window seat cushion
  • Replace desks
  • Add another computer chair
  • Add a reading chair
  • Add a drafting table
  • Add pegboards for storage
  • Fix cabinet doors
  • Add art and decoration

The garden

 
 

to-do

  • Rearrange raised beds
  • Remove unwanted bushes
  • Move shrubs
  • Remove pampas grass
  • Have trees trimmed
  • Have gutter installed
  • Set up second rain barrel
  • Plant garden for spring and fall